Sunday, May 15, 2011

THE SPRING PROJECT!

 We moved everything from the pantrys and kitchen into the living room. We have decided to get rid of the 3 different floors in the entry way , dining room, kitchen and laundry room. We chose a beautiful Italian tile and decided to make everything match.
 First we had to tear out all the old floors. Oh how fun. Oh how messy.
 Oh how DUSTY!!!!! It took Eric and I about 6 days to get rid of everything out. Then our contractor got ill. It took him 4 weeks to get started.

Keeping up with the dust in this house has been something to behold. After we are done I am going to hire someone to vaccum out the air ducts. We are now 2/3rds done with the tile. I will have pictures at another time. We have our laundry room back. Oh my word, not to have a washer and dryer for almost a month has not been that fun. We have our kitchen back also.  Saturday I was able to get most of the stuff out of my livingroom and put it back where it belongs. The only thing we have left is the dining room. We also decided to move our family room furniture upstairs to the living room and the living room furniture downstairs to the family room. We quite like the decision. I have ordered new fabric for the living room drapes and will be painting the living room soon. I love being busy. The weather is getting better so it is now time to plant the garden.

3 comments:

  1. I like all the results. If we ever settle down you can come redo for us.

    ReplyDelete
  2. If you run out of projects I've got plenty and a great place to hook up your camper/trailer too! Your house is looking great!

    ReplyDelete
  3. Thanks famerette for the invite. Thanks to my ocd I get alot done. Plus I am just a little insane.

    ReplyDelete