Sunday, May 15, 2011

WINTER WAS VERY BUSY!

 The tiles in my Mother's bathroom started to become loose. I decided on a Thursday that her bathroom needed to be redone.
Thursday afternoon Andrea and I ripped up the floor and tore everything out.
 It was so dusty that is set off the fire alarm twice. The alarm is hooked into the firestation so they were about to send a fire truck to us. They called and I told them I was doing destruction in our bathroom.
 After I put on the cement board we put on a rubber substance. Mom can now flood the bathroom without the floor and basement below getting ruined.
 I started to tile Saturday morning. I used the fast setting mud and was able to grout that night.
 We were able to get the bathroom in usable condition that weekend. I needed just to get the toilet in. Mom was totally confused so I had to hurry.
Through out the week I worked on the bathroom till it was finished. I put beadboard around the walls and bought some fabric for the shower curtain. I liked how everything turned out.

No comments:

Post a Comment